6. Under Available time period for the operation of the load, enter the required start time and end time.
7. Under Maximum operating time of the load in the time period, use the slider to set the maximum possible
value.
8. Select the time period type Load CAN be switched on.
9. You must use Load is switched on depending on to define the conditions under which the load should be
switched on (see Section12.1.3.2, page72).
☑ If you select Proportion of the PV energy, you must use light bulb slider to set the minimum proportion of
PV energy that must be present so that SunnyHomeManager will switch on the load during the configured
time period.
For example, if you set the slider to 50%, the heat pump will be turned on only when there is enough PV
energy to meet 50% of the energy demand.
The percentages for each energy type are displayed to the right of the slider.
☑ If you select Maximum permitted energy costs, you must use the light bulb slider to set the maximum
energy costs at which SunnyHomeManager will switch on the load during the configured time period.
For example, if you set the slider to 0Euro/kWh, the heat pump will be switched on only when there is
enough surplus PV energy or when there is more PV energy available than can be fed into the utility grid.
The costs are displayed in Eur/kWh to the right of the slider.