12 Load Control
SMA Solar Technology AG
Operating manualHM-20-BE-en-1986
10. If you have selected the time period type Load CAN be switched on, you must use Load is switched on
depending on to define the conditions under which the load should be switched on (see Section12.1.3.2,
page72).
If you select Proportion of the PV energy, you must use light bulb slider to set the minimum proportion of
PV energy that must be present so that SunnyHomeManager will switch on the load during the configured
time period.
For example, if you set the slider to 50%, the device (e.g., a heating element) will be turned on only when
there is enough PV energy to meet 50% of the energy demand.
The percentages for each energy type are displayed to the right of the slider.
If you select Maximum permitted energy costs, you must use the light bulb slider to set the maximum
energy costs at which SunnyHomeManager will switch on the load during the configured time period.
For example, if you set the slider to 0Euro/kWh, the device will be switched on only when there is enough
surplus PV energy or when there is more PV energy available than can be fed into the utility grid.
The costs are displayed in Eur/kWh to the right of the slider.
11. Click on [Accept].
12. Click on [Save].
The time periods configured according to weekdays are shown as colored bars in the Load planning area.
12.5.2 Adding an additional time period
If a load is not to run throughout the day, but rather at predefined intervals (e.g. pond pump), you must set up several
consecutive time periods for this day. Here, the number of time periods equates to the number of intervals in which the
load is to run.
Procedure:
1. Select Configuration > Load Overview and Planning in the page and menu selection.
2. In the line of the required load, in the column Configuration, select the symbol .
3. In the tab Name of Load, select the button [Edit].
4. Click on [Configure time period].
5. Select Add time period .
A new time period with the corresponding number will be displayed in the Time period overview.
6. Make the required settings.
7. Click on [Accept].
8. Click on [Save].
12.5.3 Deleting a Time Period
You cannot delete all the time periods for a load. At least 1 time period must always be configured for each load. If no
switching device is assigned to the load, however, the time period has no effect on the operation of the load.
Procedure:
1. Select Configuration > Load Overview and Planning in the page and menu selection.
2. In the line of the required load, in the column Configuration, select the symbol .
3. In the tab Name of Load, select the button [Edit].
4. Click on [Configure time period].
5. Click on the recycle bin for the required time period and confirm the security prompt.
6. Click on [Accept].
7. Click on [Save].

Table of Contents

Other manuals for SMA HM-20

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMA HM-20 and is the answer not in the manual?

SMA HM-20 Specifications

General IconGeneral
BrandSMA
ModelHM-20
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals