EasyManua.ls Logo

Steketee EC-WEEDER - Maintenance and Repair Work 9.2 Maintenance 9.2.1 Maintenance Schedule; Maintenance; Maintenance Schedule

Default Icon
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.2 Maintenance
9.2.1 Maintenance schedule
Chap. Task to execute
Before the season
After cleaning
After the rst 2 operating hours
Every 10 operating hours
Every 20 operating hours
Every 50 operating hours
Every 100 operating hours
Every 200 operating hours
Every 4000 operating hours
Annually
At the latest 6 years after date of manufacture
SERVICE PERSONNEL
Page
9.2.2 Check the top link pin and the lower link
pin at the headstock
99
9.2.3.1 Check tyres 99
9.2.3.1 Checking air pressure 100
9.2.3.1 Checking wheel nuts 100
9.2.3.2 Checking bolted connections of the hoeing
elements
100
9.2.3.2 Checking parallelograms of the hoeing
elements
101
9.2.4 Check lighting equipment 101
9.2.4 Check marking 101
9.2.4 Checking safety sticker 101
9.2.5 Checking hydraulic hoses 101
9.2.5 Replacing hydraulic hoses 102
9.2.5 Check hydraulic connections 102
9.2.6 Checking connector plugs and lines 102
9.2.7 Check soil cultivation implements 103
Maintenance and repair work
en-GB | Item no. 17513597 | BA 02/05-2022 98

Table of Contents