EasyManua.ls Logo

Steketee EC-WEEDER - Check Lighting Equipment; Check Marking; Checking Hydraulic Hoses; Checking Parallelograms of the Hoeing Elements

Default Icon
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The parallelograms of the hoeing elements (basic
1
and combination
2
) are suspended in a movable manner.
1. Observe bolted connections. Check moving parts for play.
2. If a parallelogram is too loose laterally: Retighten screws.
9.2.4 Checking safety devices
Ensure proper functioning.
Ensure proper functioning.
Ensure legibility and integrity.
9.2.5 Hydraulics
1. Check hydraulic hoses for damage and leakages.
ð
Replace damaged or defective hydraulic hoses immedi‐
ately.
2. Check date of manufacture of the hydraulic hoses.
ð
Have hydraulic hoses replaced at the latest after 6 years.
Checking parallelograms of the
hoeing elements
1 2
1
Parallelogram Basic-Element
2
Parallelogram Combi-Element
Check lighting equipment
Check marking
Checking safety sticker
Checking hydraulic hoses
Maintenance and repair work
en-GB | Item no. 17513597 | BA 02/05-2022 101

Table of Contents