EasyManua.ls Logo

Stryker FL23SE - Transfer Plate Replacement

Stryker FL23SE
193 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.stryker.com 72-1048E MM FL23SE REV A 25
Return To Table of Contents
TRANSFER PLATE REPLACEMENT
Tools Required:
3/8” Drive Ratchet•
7/16” Socket •
7/16” Combination Wrench •
Torque Wrench •
Procedure:
Note
Unless otherwise indicated, refer to Figure 4.1 A on pg. 22 for the following replacement procedure.
Completely raise the bed and apply the brakes. 1.
Depending on the siderail position, place the mattress support sections as follows: 2.
Head Siderail: Completely raise the head section. •
Foot Siderail: Lower completely the head section. Completely raise the thigh section, then lift and fold back the •
foot section toward the head end of the bed.
Unplug the bed power cord from the wall outlet. 3.
Lower the siderail needing repair. 4.
Using the 7/16” socket and 7/16” combination wrench, remove the two locknuts, bushings, washers and bolts (I) 5.
holding the transfer plate (J) to the siderail mechanism.
Note
At assembly, tighten the two locknuts to a 75 in/lb torque using the torque wrench.
Reverse the above steps to install the replacement transfer plate. 6.
Verify the siderail for proper operation before returning the bed to service.7.
Service Information

Table of Contents

Related product manuals