EasyManua.ls Logo

SUNWARD SWDE200B - Crawler Maintenance

SUNWARD SWDE200B
109 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SWDE200B Operation & Maintenance Manual
83
should be filled with lubricating grease.
Change the attached kit of sealing parts.
For ensuring the performance of main engine, after assembly, it shall be had a test run, the idling
time shall not be less than 0.5 hours, the transmission case should not have the phenomenon of
abnormal sound, burning and rough running. There shall be no abnormal wear between gears.
Observe the leakage carefully, retighten the joints and threaded joint if necessary.
SUNWARD INTELLIGENT EQUIPMENT CO., LTD. will not be responsible
for any of the following circumstances
The use not according to the rules
●Incorrect or non-standard operation i
Lack of maintenance
Use bad working medium
Damage caused by using non Sunward equipment or spare parts.
Due to the unskilled operating rotary head caused the whole equipment damage.

Table of Contents

Related product manuals