SWDE200B Operation & Maintenance Manual
should be filled with lubricating grease.
Change the attached kit of sealing parts.
For ensuring the performance of main engine, after assembly, it shall be had a test run, the idling
time shall not be less than 0.5 hours, the transmission case should not have the phenomenon of
abnormal sound, burning and rough running. There shall be no abnormal wear between gears.
Observe the leakage carefully, retighten the joints and threaded joint if necessary.
SUNWARD INTELLIGENT EQUIPMENT CO., LTD. will not be responsible
for any of the following circumstances
:
● The use not according to the rules
●Incorrect or non-standard operation i
● Lack of maintenance
● Use bad working medium
● Damage caused by using non Sunward equipment or spare parts.
● Due to the unskilled operating rotary head caused the whole equipment damage.