5. Removal & Installation of Engine
5-12
Engine Installation
Install the engine according to the reversing order
of removal.
Caution
z Note both feet and hands safety for
squeezing as engine installation.
z Do not bent or squeeze each wires or hose.
z Route all cables and wires in accordance with
the routine layout.
Engine hanger nut:
Torque Value: 7.5~9.5kgf-m
Rear cushion bolt:
Torque Value: upper: 3.5~4.5kgf-m
under: 2.4~3.0kgf-m
Rear wheel axle nut:
Torque Value: 11.0~13.0kgf-m
To this chapter contents