EasyManua.ls Logo

Tally T6090 - Page 92

Default Icon
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
T6090 Maintenance Manual
4–22
Reinstalling
To reinstall the Ribbon Shield, reverse the sequence and actions of the removal steps. Make
sure the shield is flush against the Hammer Bank, and the tips of the hammers themselves are
centered in the holes of the Ribbon Shield.
After installing a new Ribbon Shield, check for proper platen gap alignment (see Proce-
dure 25) and perform a Hammer Calibration. (Hammer calibration is explained in
Chapter 2, under PrntCal Parameter.)

Table of Contents

Other manuals for Tally T6090

Related product manuals