EasyManua.ls Logo

Transfluid DB 2090 ST - Assembling and Setting up

Default Icon
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting up the machine
35
5.1 Assembling and setting up
In order to set up the machine, observe the following procedure:
Set the machine at the corner points on the provided machine pads, in order
to achieve a fixed status and better isolation.
Align the machine over the set screws horizontally. Embodying of the machine
is not intended.
i
NOTE!
The machine may be operated only in closed and dry areas.
The underground should be even and horizontal.
Machine pad
Set screw

Table of Contents

Related product manuals