EasyManua.ls Logo

TYM T723 - Page 84

TYM T723
259 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(2) installation of each sub-assembled shaft.
a. Refer to the description for all parts around the front transmission
Fig.5-29
5-14
c. Installation of the main change gears and the reverse gears.
Install each sub-assembled shift into the reverse metal.
b. Installation of the creep parts in the reverse metal
1
Snap ring
Note : Be careful direction of the oil groove (to direction of the gear)
Snap ring
Reverse change
Main change
Creep gears
PTO shaft
Drive shaft
Reverse
gears
Main change gears
A
A : Direction of
the oil groove
Fig.5-27
Fig.5-28

Table of Contents

Related product manuals