Vertiv™ NetSure™ 5100 Series -48 VDC Power System Installation Manual
Proprietary and Confidential © 2023 Vertiv Group Corp.
Table 4.3 Switch Settings on the SM-DU (List 60 Hybrid Connection Cabinet) (cont’d from previous page)
Off
NA
Shunt parameter is set through DIP switch.
On Shunt parameter is set via software.
NA
Off
NA
Bi-Stable Contactor
On Mono-Stable Contactor
NA
Off
NA
LVD / reconnection is disabled upon communication
failure.
On
LVD / reconnection is enabled upon communication
failure.
NA
On LVD2 is a Dry Contact
Off LVD2
Off Off
NA
Shunt 5 is Disabled
Off On Shunt 5 is Used for Battery
On Off Shunt 5 is Used for Load
On On Shunt 5 is Set via Software
NA
Off Operation Mode
On Calibration Mode
Note 1: Setting for this system.