PergoTex II/ PergoTex II LED
Instructions for assembly
We reserve the right to make technical changes
3
Fixing materials
The table below contains an overview of the installation materials you will need foro installation of
the weinor roof and where you can obtain them:
through
Screws for fixing to the wall
and roof
Pre-compressed sealing tape
Adolf Würth GmbH &
Co. KG
Allround mastic tape Extrem
plus 5000
All installation materials required for the on-site circuit points must be ordered by the on-site crew.
Please ensure that all screws you order are made of stainless steel (A2).
3.1 Details on adhesives and sealing compound
Recommendations for selecting adhesive and sealing compound:
"Takeseal sealant" from Fix-Tec
Alternative jointing compounds:
• Please follow the manufacturer’s guidelines
• Check on-site whether these are suitable
Sealing the on-site circuit points:
• Choose adhesives and sealants in accordance with the on-site structural conditions
• Please follow the manufacturer’s guidelines
Provision before applying the adhesive and sealant:
• Clean and prime all parts and surfaces before conglutination
• If structural colours have been used, sand down the areas to be glued then clean and prime
• The gluing/sealing work should only be performed at reasonable temperatures (always follow
the manufacturer’s guidelines for adhesives and sealing compound)
Failure to follow these recommendations may result in:
• Leakiness in the constructional circuit points
• A loss in adhesion on certain parts