EasyManua.ls Logo

weinor PergoTex II - Wall Installation Steps; 5.1 Wall Gap Sealing Profile

weinor PergoTex II
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PergoTex II/ PergoTex II LED
Instructions for assembly
Version 9
05.10.2017
We reserve the right to make technical changes
Item number
118697-0000
Page 13/66
5 Wall installation
5.1 Installation of the wall gap sealing profile
Improper selected fixing material
Appropriate dowels and chemical anchoring materials must be selected at the site of installation
after estimation
of the type of masonry there.
During this estimation, a number of factors must be taken into account: condition,
consistency, compactness, surface appearance.
Further information can be found by consulting the notes provided by the
manufacturers of the anchoring systems.
Unevenness and slopes on the on-site circuit points
Any unevenness and slopes on the on-site circuit points must be levelled out on-site. This
is essential to ensure that the weinor PergoTex II is installed correctly.
Possible resources / fixings for levelling out unevenness:
Support blocks
Frame wideners
Figure 3: View of uneven wall from above
IMPORTANT
Uneven wall

Table of Contents

Other manuals for weinor PergoTex II

Related product manuals