Option: Setting posts in concrete 5.2.3
Cust post to required length
• Saw posts to length if required. Take
depth of concrete encasing into
account.
Note:
The posts will need to be machined on site
to ensure that they cannot
be removed from the foundations.
There are different possibilities to do this,
which can also be
combined:
• Self tapping countersunk hex head
screws M8x40 Torx are screwed into
the screws channels at the bottom of
the post.
• Screw the screws sideways into the
posts and drill posts sideways several
times (at least 13 mm in diameter to
allow the concrete to flow into the
posts).
• When the plug-in unit profile has been
inserted, it will be fixed from the inside,
together with the post, using self-
tapping screws.
Apply the corrosion protection
• Before inserting the posts into the
foundations, they will need to be treated
with an anti-corrosion coating.
• Protective coatings containing
chromates or silicate are suitable for
this purpose, but adhesive bitumen
paint also works.
• Insert the posts into the holes in the
foundations; do not set the posts in
concrete at this point but simply secure
them so that they can be aligned during
the installation.
Only when the weinor PergoTex II has
been
completely installed and aligned
can the posts be set in concrete
in the foundations.