PergoTex II/ PergoTex II LED
Instructions for assembly
We reserve the right to make technical changes
5.19 Installation of the "wall gap sealing profile top section"
Installation of the the "wall gap sealing
profile upper part top section"
1. Remove protective film from adhesive tape
on the "wall gap sealing profile upper part
top section" (1).
2. Place the "wall gap sealing profile upper
part top section" (1) from the top onto the
wall gap sealing profile (2) or the "safety
shield retaining profile“ (3) and clip into
place.
Note:
In event of blocking, you can also drive in the
"wall gap sealing profile upper part top section"
(1) using a rubber hammer.
3. Seal to the house wall.
If the weinor PergoTex II is equipped with a
third side channel in the centre, the retention
profile safety shield (1) is delivered in two
sections. The surge point is sealed from above
with the "retention profile safety shield cover"
(3). To do this, the sealing band (4) is first
adhered to the bottom side of the "retention
profile safety shield cover" (3). Then bolted with
drilling screws 3.9x13 Torx (5).
5.20 Sealing
1. Wall gap sealing profile and "wall gap sealing profile upper part top section" to house wall
(see Chapter 5.18).
2. "Safety shield retaining profile cover" in divided "safety shield retaining profile" (see Chapter
5.18).
3. Corner at transition from "side channel safety shield connection" to safety shield profile (see
figure below).
4. If the pitch is below 8°, seal the upper chamber of the side channel to the "wall connection
cover cap".
5. Seal the top long slots on the "wall gap sealing profile cover caps".
Figure to section 4 and 5.:
filler cord