EasyManua.ls Logo

ABB IRB 8700 Series - Page 746

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Make sure the o-rings are in position and slide
the motor flange into position.
10
xx1600000068
Note
When the four six-hole washers are fitted, make
sure that the three holes in the gearbox will be
covered. See figure!
11
Attachment screws: M16x130 12.9
Gleitmo 603
xx1500002355
Attach 20 of the 24 attachment screws with the
four six-hole washers.
12
xx1500002356
Remove the guide pins and attach the remaining
screws.
13
Attaching the axis-3 gearbox to frame, step 2
Use this procedure to secure the axis-3 gearbox, together with the motor flange,
to the frame.
NoteAction
Tightening torque: 300 Nm
xx1500002373
Secure motor flange together with the gearbox,
to the frame.
1
Continues on next page
746 Product manual - IRB 8700
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.4 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals