EasyManua.ls Logo

ABB IRB 930 - Page 298

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
For robots with protection class
IP30
Remove the screws locking the process hub.2
xx2300000487
Push the process hub to the outer arm.3
Removing the cover of the outer arm
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
For robots with protection class
IP30
Remove the screws on the cover of the outer arm
and remove the cover.
2
xx2300000488
Releasing the axis-3 timing belt
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
298 Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.3 Replacing the pulley on the ball screw lower position
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals