EasyManua.ls Logo

ABB IRB 930 - Page 330

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2300000497
Remove the screws on the bracket.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
3
Removing the axis-3 motor sub-assembly
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
DANGER
Make sure that the ball screw is supported with
something.
The sudden drop of the ball screw due the lost of
the axis-3 motor may cause danger.
2
xx2300000594
Remove the screws.3
Remove the axis-3 motor sub-assembly.4
Releasing the ball screw with the flange
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
330 Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.5 Replacing the axis-3 timing belt
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals