EasyManua.ls Logo

ABB IRB 930 - Page 350

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Timing belt, A3:Insert the timing belt to the pulley on the ball
screw.
2
3HAC081705-001
xx2300000596
Screws: Hex socket head cap
flange screw 3HAB3412-520M5x16
12.9 Lafre 2C2B/FC6.9+PrO-
COat111 (5 pcs)
Refit the screws and washers to the secure the
ball screw flange to the outer arm.
Tip
Pre-tighten the screws at 0.5Nm and slide the ball
screw up and down for five times. Then tighten
the screws at 6 Nm ±3% to secure it.
3
Tightening torque: 6 Nm ±3%
xx2300000559
Refitting the axis-4 motor sub-assembly
NoteAction
xx2300000597
Refit the motor with flange to the outer arm.
Tip
Move the internal harness out of the way.
1
Continues on next page
350 Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.6 Replacing the axis-4 timing belt
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals