EasyManua.ls Logo

ABB IRB 930 - Page 353

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Tightening torque: 6 Nm ±10%Tighten the motor flange screws when the timing
belt meets the requirement.
5
Refitting the base bracket
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Lay the main harness in a natural state without
distortion.
2
Screws: Hex socket head cap
screw M4x10 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the cable ferrule to the bracket.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Tightening torque: 2.4 Nm ±10%
xx2300000503
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Refit the base bracket to the base and secure with
the screws.
3
Reconnecting the connectors for axis-4 motor
NoteAction
xx2300000495
Insert the female head of the connectors to the
bracket accordingly.
Tip
The mistake proofing measure has been applied
to the connectors, the connectors may be dam-
aged if excessive force is used.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Continues on next page
Product manual - IRB 930 353
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.6 Replacing the axis-4 timing belt
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals