EasyManua.ls Logo

ABB Relion 620 Series - Page 1035

ABB Relion 620 Series
1224 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Example 2
There are two separate sequences implemented with three shots. Shot
1 is implemented by CBB1 and it is initiated with the high stage of the
overcurrent protection (I>>). Shot 1 is set as a high-speed autoreclosing
with a short time delay. Shot 2 is implemented with CBB2 and meant to be
the first shot of the autoreclose sequence initiated by the low stage of the
overcurrent protection (I>) and the low stage of the non-directional earth-
fault protection (Io>). It has the same reclosing time in both situations.
It is set as a high-speed autoreclosing for corresponding faults. The third
shot, which is the second shot in the autoreclose sequence initiated by I>
or Io>, is set as a delayed autoreclosing and executed after an unsuccessful
high-speed autoreclosing of a corresponding sequence.
Figure 554: Autoreclosing sequence with two shots with different shot
settings according to initiation signal
t
HSAR
Time delay of high-speed autoreclosing, here:
First reclose
time
t
DAR
Time delay of delayed autoreclosing, here:
Second reclose
time
t
l>>
Operating time for the I>> protection stage to clear the fault
t
l>
or
lo>
Operating time for the I> or Io> protection stage to clear the
fault
t
CB_O
Operating time for opening the circuit breaker
t
CB_C
Operating time for closing the circuit breaker
1MRS757644 H Control functions
620 series
Technical Manual
1035

Table of Contents

Other manuals for ABB Relion 620 Series

Related product manuals