EasyManua.ls Logo

ABB Relion 620 Series - Page 1034

ABB Relion 620 Series
1224 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 552: Autoreclosing sequence with two shots
t
HSAR
Time delay of high-speed autoreclosing, here:
First reclose time
t
DAR
Time delay of delayed autoreclosing, here:
Second reclose time
t
Protection
Operating time for the protection stage to clear the fault
t
CB_O
Operating time for opening the circuit breaker
t
CB_C
Operating time for closing the circuit breaker
In this case, the sequence needs two CBBs. The reclosing times for shot
1 and shot 2 are different, but each protection function initiates the same
sequence. The CBB sequence is described in
Table 1003
as follows:
Shot 1
(CBB1)
0.3s
Shot 2
(CBB2)
15.0s
INIT_1 (I>>)
INIT_2 (I>)
INIT_3 (Io>)
Lockout
Lockout
Lockout
Figure 553: Two shots with three initiation lines
Table 1003: Settings for configuration example 1
Setting name Setting value
Shot number CBB1 1
Init signals CBB1 7 (lines 1, 2 and 3 = 1+2+4 = 7)
First reclose time 0.3s (an example)
Shot number CBB2 2
Init signals CBB2 7 (lines 1, 2 and 3 = 1+2+4 = 7)
Second reclose time 15.0s (an example)
Control functions 1MRS757644 H
1034 620 series
Technical Manual

Table of Contents

Other manuals for ABB Relion 620 Series

Related product manuals