EasyManua.ls Logo

Advanced Instruments A2O - Setting Up A2 O LIS Communications; Setting Up the A2 O ’s LAN Connection

Advanced Instruments A2O
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model A
2
O
®
Advanced Automated Osmometer Users Guide
Remove the syringe and tubing from the underside of the waste
bottle cap.
Replace the cap on the waste bottle and tighten the cap securely.
Prime the system a minimum of 2 cycles using A
2
O System Fluid
(part no. 200222).
5. Clear the Database
The instrument database size should be checked on a weekly basis
and cleared if it exceeds 1,000 records.
To clear the database, go into the System Configuration and click
on the Clear Database button (Figure 47).
96
The next screen (Figure 48) will allow you to export the results
before deleting them.
Clear Database
Button
Figure 47: Clear Database Button

Table of Contents

Related product manuals