TABLE OF CONTENTS
UL EX3470 ULC EX3470
PAGE TOC-2 REV. 11 2014-SEP-1
R-102 Restaurant Fire Suppression Manual
SECTION PAGES
IV. SYSTEM DESIGN (Continued) 4-1 – 4-76
TANK AND CARTRIDGE 4-61
REQUIREMENTS
ACTUATION AND EXPELLANT 4-61 – 4-63
GASLINEREQUIREMENTS
DISTRIBUTION PIPING 4-63 – 4-70
REQUIREMENTS
General Piping Requirements 4-63
Supply and Branch Line 4-64 – 4-65
Identification
1.5 Gallon System 4-66
3.0 Gallon System 4-67
6.0 Gallon Manifolded System 4-68 – 4-69
9.0 Gallon System 4-70
DETECTION SYSTEM 4-71 – 4-73
REQUIREMENTS
Detector Identification 4-71
Detector/Pulley Elbow/Conduit 4-71
Off-set Design Limitations
Detector Placement Requirements 4-71 – 4-72
Detection Line Requirements 4-72
Fusible Link Selection 4-72
Electric Thermal Detector 4-73
MANUAL PULL STATION 4-73
REQUIREMENTS
MECHANICAL GAS VALVE 4-74
REQUIREMENTS
ELECTRICAL GAS VALVE 4-74 – 4-75
REQUIREMENTS
Approvals 4-75
ALARM INITIATING SWITCH 4-75
REQUIREMENTS
ELECTRICAL SWITCH 4-75
REQUIREMENTS
V. INSTALLATION INSTRUCTIONS 5-1 – 5-44
INSTALLING RELEASE ASSEMBLY 5-1 – 5-3
COMPONENTS
INSTALLING THE DISTRIBUTION 5-4 – 5-5
PIPING
INSTALLING THE AGENT 5-5 – 5-8
DISTRIBUTION HOSE (FOR
CASTERED/MOVEABLEEQUIPMENT)
INSTALLING THE ACTUATION AND 5-8 – 5-12
EXPELLANT GAS LINE
INSTALLING THE DETECTION 5-13 – 5-16
SYSTEM
INSTALLING REMOTE MANUAL 5-17 – 5-18
PULL STATION
General Installation Requirements 5-17
Installation for Remote Manual Pull 5-17 – 5-18
Station Utilizing EMT Conduit Only
INSTALLING MECHANICAL 5-18 – 5-22
GAS VALVE
INSTALLING REMOTE MANUAL 5-22 – 5-34
PULL STATION OR MECHANICAL
GAS VALVE UTILIZING
FLEXIBLE CONDUIT
SECTION PAGES
V. INSTALLATION INSTRUCTIONS 5-1 – 5-44
(Continued)
INSTALLING ELECTRICAL 5-35
GAS VALVE
INSTALLING ELECTRICAL 5-36 – 5-38
SWITCHES
INSTALLING ALARM 5-39
INITIATING SWITCH
ELECTRICAL SWITCH 5-40 – 5-42
REQUIREMENTS
WIRING 24VDC REGULATED 5-43
RELEASE ASSEMBLY
VI. TESTING AND PLACING IN SERVICE 6-1 – 6-4
TESTING MANUAL PULL STATION 6-1
TESTING MECHANICAL GAS 6-1 – 6-2
VALVES
TESTING ELECTRICAL GAS 6-2
VALVES
TESTING ELECTRIC SWITCH 6-2 – 6-3
TESTING DETECTION SYSTEM 6-3 – 6-4
VII. RECHARGE AND RESETTING 7-1 – 7-6
PROCEDURES
CLEANUP PROCEDURES 7-1
RECHARGE 7-1 – 7-4
RESETTING 7-4 – 7-6
REPLACEMENT CARTRIDGE 7-6
VIII. MAINTENANCE EXAMINATION 8-1 – 8-12
SEMI-ANNUAL MAINTENANCE 8-1 – 8-5
EXAMINATION
ANNUAL MAINTENANCE 8-5
EXAMINATION
12-YEAR MAINTENANCE 8-6 – 8-11
EXAMINATION
IX. APPENDIX 9-1 – 9-18
SYSTEM SELECTION GUIDE 9-1 – 9-4
SYSTEM COMPONENT INDEX 9-5 – 9-8
PARTS LISTS 9-9 – 9-14
MULTIPLE NOZZLE FRYER 9-15 – 9-16
PROTECTION CALCULATION
EXAMPLES
WIRING DIAGRAM 9-16 – 9-17