EasyManua.ls Logo

Attila DIGITAL - Blasting Cycle with Core Probe

Attila DIGITAL
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USE AND MAINTENANCE MANUAL
ATTILA
37
EN
8.4.3. BLASTING CYCLE WITH CORE PROBE
If, when starting a probe blasting, the error “PnS” appears after 5 minutes, reposition
the probe in a more suitable way. Alternatively, the blasting will continue in timed mode.
To carry out the blasting cycle with core probe:
STEP ACTION
1 Press the O/I main switch.
2
Press the button and select the standard temperature +3°C or -18°C.
3
Press to start the cycle.
4
When the cycle is finished (when the buzzer starts to sound), the equipment automatically switches to the storage
phase.
Note: the buzzer can be muted with the button.
5
To interrupt the cycle, press .

Table of Contents