Instruction Manual w VERTICUS 5 Compressor Units
E-4
- Check the oil pressure on the pressure gauge or the oil
flow in the sight glass. If there is any fault, check the lu
brication of the compressor.
- After 10 minutes, close the filling valves or the outlet
valve and run the unit up to final pressure until the final
pressure safety valve blows. To do so, override the pres
sure switch, if installed on the unit. On compressors fit
ted with a factory-installed B-CONTROL compressor
control unit, the unit has to be set to “Saftey valve
check” in “Operation mode” menue. Refer to chapter
A.11.
- Check the inter-pressure safety valves for leakage.
- Establish cause of any fault from the trouble-shooting
table, section D-16., and remedy.
- Stop the system when running properly, the compressor
is then ready for operation.
7. TRANSPORTATION
- Packing and/or receptacle must be easy to handle and
in such a condition as to protect their content during
transportation.
- Loose parts as tools and accessories have to be packed
in a suitable individual packing.
- Moving parts have to be fixed at the unit.
- Electric and electronic parts and their connections have
to be protected against humidity and mechancial dam
age.