Index b
(Master – to be added to the documentation)
SpaceStation, 2.0 gb 7- 1
Sheet 1 of 2
M690 00 00 46 F04 / 3891 7548 (GB)
7-Technical Safety Check (TSC)
Checklist for Technical Safety Check – Every 24 Months
Unit: SpaceStation (SPS) / SpaceStation with SpaceCom (SPCO) /
SpaceCover standard (SPCS) / SpaceCover comfort (SPCC)
Manufacturer: B. Braun Melsungen AG
User
Observe the Service Manual and the instructions for use. All measured values are to be documented.
Accessories used should be included in testing. Make excl. use of calibrated measuring equipment.
Article No. Unit No. Year of Procurement
Visual Inspection Electrical Safety
as per EN 60601-1
or VDE 0750 Part 1 and VDE 0751 Part 1
Functional Inspection
❒ Cleanliness, completeness, damage and
legibility of the labels
❒ Pump suspension
❒ Well running and sealing of the pump
lock
❒ Data and power interface (MSC con-
nector)
❒ Interfaces SPCO
❒ Mains cable / connector and connect-
ing line
❒ Mains voltage ______ V AC
❒ Protective conductor resistance___ Ω
Unit incl. mains connecting
line to mains voltage
output F1B ≤ 0.2Ω
❒ Earth leakage current at NC_____ µA
≤ 30 µ A
❒ Earth leakage current at SFC_____ µA
≤ 60 µ A
❒ Housing leakage current SPCO ___ µA
Metal collar Ethernet RJ45
≤ 25 µA without SL
Switch on unit.
❒ Staff call
❒ Indicator lamps SPCC
❒ Audible alarm on SPCC
❒ Indicator lamps SPCO
❒ Functional inspection according to the
instructions for use and dependent on
the configuration
Accessories Used Units Used
❒ ____________________________
❒ ____________________________
❒ ____________________________
❒ Perfusor® Space, serial No.:
______________
❒ Infusomat® Space, serial No.:
______________
Test result:
Defects found which could endanger patients, users or third parties: Yes No
Inspection performed by:
Measures to be taken: Repair
___________________
Unit handed over on:
Special features / documentation:
To:
Date / Signature:
Next deadline:
2.0