EasyManua.ls Logo

Broadcom Brocade X7-8 - Time and Items Required for Removal and Installation; Removing a Blade

Broadcom Brocade X7-8
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
"Slot unknown" message relating to the blade slot
FRU: FRU_FAULTY messages for the blade
FAULTY (xx) with an associated (xx) code used by support
For output examples and additional information on Fabric OS commands, see Using Monitoring Commands and the
Brocade Fabric OS Command Reference Manual.
For more information about error messages, refer to the Brocade Fabric OS Message Reference Manual.
Time and Items Required for Removal and Installation
The removal or installation procedure for each blade takes less than 10 minutes. Removing and restoring transceivers
and cables may take longer depending on how many must be changed. The following items are required for the blade and
filler panel replacement:
Electrostatic discharge (ESD) grounding strap
Workstation computer
Replacement blade or filler panel
No. 1 Phillips screwdriver
SFP, SFP+, or SFP28 transceivers (as needed)
Optical and copper cables (as needed)
NOTE
For information about the transceivers that are qualified for this Brocade device, see Supported Transceivers
and Cables.
Removing a Blade
Before removing the blade, consider the following:
X7-8-Install-IG100
120
Broadcom

Table of Contents

Related product manuals