EasyManuals Logo

BRP Evinrude E-TEC Series User Manual

BRP Evinrude E-TEC Series
443 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #257 background imageLoading...
Page #257 background image
255
POWERHEAD
ASSEMBLY
10
screws in stages to 168 to 192 in. lbs. (19 to 21.7
N·m).
Repeat steps for opposite cylinder head.
Crankshaft and Connecting
Rods
Rotate cylinder block so crankcase mating flange
is facing up.
Apply Gasket Sealing Compound to lower oil seal
groove in cylinder block. DO NOT put any sealer
in upper seal groove.
Check that main bearing alignment dowel pins are
seated in the block.
Thoroughly clean upper seal area of the crank-
shaft. Install new upper seal on crankshaft. Do not
apply sealer to outside diameter of the seal.
Push all pistons to the top of cylinders. Remove
numbered connecting rod caps.
Gently lower crankshaft into place.
• Orient all crankcase seal ring gaps facing up.
• Align tab on lower bearing seal housing with
hole in crankcase.
• Align upper oil seal in groove.
• Locate each main bearing on its dowel pin. A
mark placed on the bearing race opposite the
dowel pin hole will help in the alignment pro-
cess.
1. Cylinder head screws (28 on V4; 40 on V6) 005289
1. Gasket Sealing Compound
2. Dowel pins
3. No sealer here
005290
11
2
3
1
49068
1. Gaps (up)
2. Lower seal housing
3. Upper oil seal
4. Alignment marks
005291
1
32
4

Table of Contents

Other manuals for BRP Evinrude E-TEC Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BRP Evinrude E-TEC Series and is the answer not in the manual?

BRP Evinrude E-TEC Series Specifications

General IconGeneral
BrandBRP
ModelEvinrude E-TEC Series
CategoryOutboard Motor
LanguageEnglish

Related product manuals