EasyManuals Logo

BRP Evinrude E-TEC Series User Manual

BRP Evinrude E-TEC Series
443 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #355 background imageLoading...
Page #355 background image
353
GEARCASE
COUNTER ROTATION
12
Install wedge, screw, and washer. Apply Ultra
Lock to threads and torque screw 15 to 20 in. lbs.
(1.7 to 2.3 N·m).
Re-torque two retainer screws to 18 to 20 ft. lbs.
(24 to 27 N·m).
Confirm that torque on the wedge screw is 15 to
20 in. lbs. (1.7 to 2.3 N·m).
To complete gearcase assembly, refer to:
• LEAK TEST on p. 308
• WATER PUMP on p. 311
• SHIFT ROD ADJUSTMENT on p. 314
• REMOVAL AND INSTALLATION on p. 308
• LUBRICANT on p. 307
• Propeller Hardware Installation on p. 74
• Trim Tab Adjustment on p. 77
During break-in period of a reassembled gear-
case, change the gearcase lubricant between 10
to 20 hours of operation.
DSM02291
DSC02361

Table of Contents

Other manuals for BRP Evinrude E-TEC Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BRP Evinrude E-TEC Series and is the answer not in the manual?

BRP Evinrude E-TEC Series Specifications

General IconGeneral
BrandBRP
ModelEvinrude E-TEC Series
CategoryOutboard Motor
LanguageEnglish

Related product manuals