EasyManua.ls Logo

Canon GP405 - Selecting the Installation Site

Canon GP405
682 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COPYRIGHT
©
1999 CANON INC. CANON 405/335 REV.0 JAN. 1999 PRINTED IN JAPAN (IMPRIME AU JAPON)
12-1
CHAPTER 12 INSTALLATION
I. SELECTING THE SITE
Make sure that the site meets the following requirements; if possible, pay a visit to the user's
before the delivery of the machine:
A. The site must provide a power outlet which is rated as specified and which may be used
exclusively by the machine.
B. The site must be 7.5°C to 32.5°C in temperature and 5% to 85% in humidity. Avoid water
faucets, water boilers, humidifiers, and areas near a refrigerator.
C. Avoid areas near the sources of fire and areas subject to dust or ammonium gas. Avoid areas
exposed to direct sunshine; otherwise, be sure to provide curtains.
D. The site must be well-ventilated.
E. The site must be level so that the copier's feet will remain in contact with the floor.
F. The site must be spacious enough so that the copier will be at least 10 cm from all walls, and
there wil be enough room for maintenance work. (See the next page.)

Table of Contents

Other manuals for Canon GP405

Related product manuals