Nodal commissioning 6-7
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure 6-3 (continued)
Network element initialization
Step Action
10 Click Submit.
A confirmation page is displayed.
11 Click Accept Valid Modifications.
A network element reboot warning is displayed.
Note 1: The network element reboots after the Ethernet IP, subnet mask and
the router ID are entered. After the network element is up, verify whether all
the changes are reflected. If the changes are not reflected correctly, contact
your next level of support.
Note 2: If the PC is connected to the Craft port of the network element, then
enable DHCP in PC for NE accessibility from the PC. However, if the PC is
connected to the LAN port of the network element, then PC IP configuration
must be updated so that the newly provisioned IP address in network element
and the PC are in the same IP V4 network.
Software Version is displayed in the description field of the default WUI page.
The Software Version is of the format aabbccdd.
You have completed the network element initialization.
12 Click on the Restore from a previously backed up configuration.
13 Enter the parameters for restoring configuration.
For details, refer to Provisioning and Protection Switching Procedures,
009-6200-310.
14 Click Submit.
A confirmation page is displayed.
15 Click on Accept Valid Modifications.
A success message is displayed.
You have completed the network element backup restoration.
—end—
where
aa is the major release
bb is the minor release
ccdd describes the build version
CAUTION
Cold restart
Network element goes for a service disruptive reset.