5-1
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Installing the 6200 network element 5-
This chapter contains all the procedures for installing the following:
the 6200 network element
peripheral cables
traffic cables
The 6200 system is available in one variant:
Normal system compliant to ETSI EN 300 019-1-3 V2.1.2 CLASS 3.1
standard
Installation guidelines
The installation guidelines for the 6200 network element are as follows:
Ensure that the rack is firmly fixed to the ground.
Ensure proper grounding of the rack.
Ensure that the weight of the equipment does not make the rack unstable.
Ensure that minimum clearance between the two posts of the rack is
450mm when you are mounting the equipment on a rack.
Ensure that the DC and the AC power supply requisites are satisfied.
For the base chassis power supply: The input supply voltage is in the
range -40 V to -72 V for DC PSU and 265 V to 90 V for APU290.
For expansion chassis power supply: The input supply voltage is in the
range -40 V to -72 V.
Ensure that the wire size and dimension requirements are based on cable
length and local engineering standards and practices.
Use only manual screwdriver for fastening of any circuit packs.
Note 1: Do not use any Power screwdriver for fastening of any circuit
packs.
Note 2: You must install the 6200 network element in a restricted access
location (RAL) in accordance with EN60950.