Preparing for installation and commissioning 4-5
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Requirements
To commission an 6200 network element you must have the following
information:
• network diagrams that describe 6200 paths
• network element type for each network element in the 6200 network
• system timing diagram which shows building integrated timing supply
(BITS) sources
• fiber numbers and patch panel connections for each fiber path
Test equipment
Equipment used for measurement must be pre-calibrated by an approved test
facility.
Table 4-3 lists the test equipment to be used.
pliers
safety glasses
socket/wrench set, 1/2 in. drive
socket, 3/8 in. hexagonal 3 in. deep—for M-10, standard anchoring
socket, 5/8 in. hexagonal 3 in. deep—for M-12, earthquake anchoring
socket, 8 mm
socket, 10 mm
spirit level, 24 in.
tape
tin snips
torque wrench
wire cutters
Table 4-2 (continued)
Tools and materials list
Tool or material