EasyManua.ls Logo

Ciena 6200 - Testing STM-1;4;16;64;OC-3;12;48;192 Protection Switching with Traffic on 63 Xe1 Ds1 Service Interface

Default Icon
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System testing 7-3
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure 7-1
Testing STM-1/4/16/64/OC-3/12/48/192 protection
switching with traffic on 63xE1DS1 service interface
Use this procedure to perform the following tests on the 6200 network
element:
63xE1DS1 circuit pack test.
protection switching on the E1/DS1 port.
Prerequisites
Make sure that all the optical connectors are cleaned.
Make sure that you have adequate number of optical test cords.
Make sure that you have a variable attenuator.
Make sure that proper cross-connects are provisioned between the
E1/DS1 ports and optical ports at the far end and the near end network
elements.
Action
Step Action
1 Connect the test equipment and the 6200 near and far 6200 network
elements as shown in the Figure 7-1 on page 7-6.
CAUTION
Risk of damage to circuit packs
Electrostatic discharge can damage electrostatic
sensitive devices. Ensure that you are wearing the
antistatic strap connected to the ESD location on the
6200 network element.
DANGER
Risk of eye injury
Avoid direct exposure to laser beam or fiber. Invisible
light can blind. Keep all unused optical connectors
capped.

Table of Contents