7-48 System testing
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure 7-10
Testing 64G PKT SW circuit pack
Use this procedure to perform the Ethernet frame drop test on the 6200
network element.
Prerequisites
• Make sure that all the optical connectors are cleaned.
• Make sure that you have adequate number of optical test cords.
• Make sure that you have a variable attenuator.
• Make sure the traffic generated by the Ethernet test set is 15Mbit/s,
full-duplex.
CAUTION
Risk of damage to circuit packs
Electrostatic discharge can damage electrostatic
sensitive devices. Ensure that you are wearing the
antistatic strap connected to the ESD location on the
6200 network element.
DANGER
Risk of eye injury
Avoid direct exposure to laser beam or fiber. Invisible
light can blind. Keep all unused optical connectors
capped.