v
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Contents 0
About this document vii
Observing product and personnel safety guidelines 1-1
Safety standards 1-2
Laser radiation—optical transmission systems 1-2
Working with power 1-13
Dissipating static electricity 1-14
Preventing circuit pack damage, pluggable module and fan module damage 1-16
Controlling equipment access 1-17
Controlling equipment environment 1-17
Regulatory information 2-1
Compliance to applicable technical standards and regulations 2-1
Country-specific regulatory information 2-2
Receiving and unpacking 3-1
Shipment verification 3-1
Package handling 3-1
Storage 3-1
3-1 Unpacking the equipment 3-2
Preparing for installation and commissioning 4-1
Rack configuration 4-1
Power requirements 4-3
Tools and materials list 4-4
Requirements 4-5
Installation, commissioning and testing flowchart 4-7
Installing the 6200 network element 5-1
Installation guidelines 5-1
5-1 Installing the 6200 shelf 5-5
5-2 Connecting the 6200 to local safety ground 5-8
5-3 Connecting the DC power supplies 5-11
5-4 Connecting the AC power supply 5-15