EasyManua.ls Logo

Ciena 6200 - Page 6

Default Icon
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
vi Contents
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
5-5 Connecting the LAN and Craft cables 5-18
5-6 Connecting external synchronization interface (ESI) and alarm cables 5-23
5-7 Routing cables on the rack 5-29
5-8 Connecting fiber optic cables to STM-1/4/16 or OC-3/12/48 interfaces on 2.5G
MRO card 5-31
5-9 Connecting fiber optic cables to STM-1/16 or OC-3/48 interfaces on 15G MRO
XC card 5-33
5-10 Connecting fiber optic cables to STM-4/16/64 or OC-12/48/192 interfaces on
60G MRO XC card 5-35
5-11 Connecting and routing E1/DS1 cables 5-39
5-12 Connecting and routing 63xE1DS1WP cables through IO63xE1DS1
card 5-41
5-13 Connecting E3/DS3 cables to 6xE3DS3 interfaces 5-43
5-14 Connecting and routing 12xE3DS3 WP cables through IO12xE3DS3
card 5-44
5-15 Connecting fiber optic cables to 2xGE interfaces of 6G PKT SW circuit
pack 5-46
5-16 Connecting Ethernet cables to 4xFE interfaces of 6G PKT SW circuit
pack 5-48
5-17 Connecting fiber optic cables to 2xGE(o) interfaces of 4xGE + 4xFE circuit
pack 5-49
5-18 Connecting Ethernet cables to 2xGE(e) interfaces of 4xGE + 4xFE circuit
pack 5-51
5-19 Connecting Ethernet cables to 4xFE interfaces of 4xGE + 4xFE circuit
pack 5-53
5-20 Connecting fiber optic cables to 2xGE(o) interfaces of 64G PKT SW circuit
pack 5-55
5-21 Connecting fiber optic cables to 2x10GE interfaces of 64G PKT SW circuit
pack 5-57
Nodal commissioning 6-1
List of procedures
6-1 Connecting the PC to the local craft terminal of the 6200 network element 6-2
6-2 Logging into an uncommissioned 6200 network element 6-3
6-3 Network element initialization 6-5
6-4 Verifying the serial numbers of the 6200 chassis and the circuit packs 6-8
6-5 Setting the 6200 date and time 6-10
System testing 7-1
List of procedures
7-1 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
63xE1DS1 service interface 7-3
7-2 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
63xE1DS1 WP service interface 7-7
7-3 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
6xE3DS3 service interface 7-13
7-4 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
12xE3DS3 WP service interface 7-17

Table of Contents