7-1
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
System testing 7-
After commissioning the 6200 network element, perform system level tests
with the network elements cabled together in a working Sub Network
Connection Protection/Unidirectional Path Switched Ring (SNCP/UPSR) or
Multiplex Section Protection/Automatic Protection Switching (1+1 MSP/APS).
Table 7-1 provides the procedures for system testing.
Table 7-1
Tests to be performed
Action Details
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 63xE1DS1 service interface
Procedure 7-1
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 63xE1DS1 WP service interface
Procedure 7-2
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 6xE3DS3 service interface
Procedure 7-3
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 12xE3DS3 WP service interface
Procedure 7-4
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 4xFE interfaces of 6G PKT SW circuit pack
Procedure 7-5
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 2xGE interfaces on 6G PKT SW circuit pack
Procedure 7-6
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 4xFE interfaces of 4xGE + 4xFE circuit pack
Procedure 7-7
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 2xGE(o) interfaces on 4xGE + 4xFE circuit pack
Procedure 7-8
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching
with traffic on 2xGE(e) interfaces on 4xGE + 4xFE circuit pack
Procedure 7-9
Testing 64G PKT SW circuit pack Procedure 7-10