Contents vii
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
7-5 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
4xFE interfaces of 6G PKT SW circuit pack 7-22
7-6 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
2xGE interfaces on 6G PKT SW circuit pack 7-28
7-7 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
4xFE interfaces of 4xGE + 4xFE circuit pack 7-33
7-8 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
2xGE(o) interfaces on 4xGE + 4xFE circuit pack 7-38
7-9 Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on
2xGE(e) interfaces on 4xGE + 4xFE circuit pack 7-43
7-10 Testing 64G PKT SW circuit pack 7-48
7-11 Testing Traffic Probe 7-51
7-12 Testing Ethernet parameter retrieval using SNMP 7-54
7-13 Verifying association between 6200 and other network element 7-61
Network reconfiguration 8-1
SNCP/UPSR 8-1
List of procedures
8-1 Adding an 6200 network element to a STM-1/OC-3 ring configuration with 15G
MRO XC circuit pack 8-3
8-2 Adding an 6200 network element to a STM-4/OC-12 ring configuration with
15G MRO XC circuit pack 8-5
8-3 Adding an 6200 network element to a STM-16/OC-48 ring configuration with
15G MRO XC circuit pack 8-7
8-4 Adding an 6200 network element to a STM-64/OC-192 ring configuration with
60G MRO XC circuit pack 8-11
8-5 Deleting an 6200 network element from a STM-1/OC-3 ring Configuration with
15G MRO XC circuit pack 8-15
8-6 Deleting an 6200 network element from a STM-4/OC-12 ring Configuration
with 15G MRO XC circuit pack 8-17
8-7 Deleting an 6200 network element from a STM-16/OC-48 ring Configuration
with 15G MRO XC circuit pack 8-19
8-8 Deleting an 6200 network element from a STM-64/OC-192 ring Configuration
with 60G MRO XC circuit pack 8-22
8-9 Adding a 6200 node into a MS-SPRing/BLSR configuration 8-25
8-10 Deleting an 6200 node from a MS-SPRing/BLSR configuration 8-28
Cleaning connectors 9-1
List of procedures
9-1 Inspecting and cleaning optical interface internal connectors and fiber 9-3
9-2 Cleaning optical connectors and adapters on patch cords 9-4
Common procedures 10-1
List of procedures
10-1 Inserting the power supply unit-DC PSU/Fan+OAM/ Fan+OAMV2
module 10-2
10-2 Ejecting the power supply unit-DC PSU/Fan+OAM/ Fan+OAMV2
module 10-4

Table of Contents