7-6 System testing
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure 7-1 (continued)
Testing STM-1/4/16/64/OC-3/12/48/192 protection switching with traffic on 63xE1DS1 service
interface
Step Action
19 Put the fiber back on the protection path.
20 Record data in Table 12-11 on page 12-10/ Table 12-12 on page 12-11/ Ta ble
12-13 on page 12-12/ Table 12-14 on page 12-13 based on the STM/OC
value.
—end—
Figure 7-1
Testing E1/DS1 interfaces