Network reconfiguration 8-13
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Figure 8-3
Configuration after adding an 6200 network element to the ring with 60G MRO XC circuit pack