EasyManua.ls Logo

Ciena 6200 - Page 51

Default Icon
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the 6200 network element 5-9
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure 5-2 (continued)
Connecting the 6200 to local safety ground
Step Action
4 To verify that the grounding is done, using a multimeter, measure the potential
difference between the chassis and the rack.
Note: When the value is “0”, chassis is grounded properly.
—end—
.

Table of Contents