Installing the 6200 network element 5-9
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Procedure 5-2 (continued)
Connecting the 6200 to local safety ground
Step Action
4 To verify that the grounding is done, using a multimeter, measure the potential
difference between the chassis and the rack.
Note: When the value is “0”, chassis is grounded properly.
—end—
.