EasyManua.ls Logo

Cisco ONS 15454 - Page 460

Cisco ONS 15454
728 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13-56
Cisco ONS 15454 Reference Manual, R7.0.1
OL-9217-01
Chapter 13 Management Network Connectivity
13.7 13.7.9 OSI/IP Networking Scenarios
Figure 13-34 OSI/IP Scenario 3 with OSI/IP-over-CLNS Tunnel Endpoint at the GNE
13.7.9.4 OSI/IP Scenario 4: Multiple ONS DCC Areas
OSI/IP Scenario 4 (Figure 13-35) is similar to OSI/IP Scenario 3 except that the OSI GNE is subtended
by multiple isolated ONS 15454 areas. A separate IP-over-CLNS tunnel is required to each isolated
ONS 15454 OSPF area. An alternate approach is to create a single IP-over-CLNS tunnel from CTC/CTM
to an ONS 15454 NE, and then to configure a tunnel from that NE to an NE in each isolated OSPF area.
This approach requires additional static routes.
1 The IP OSS manages ONS and other vendor NEs using TL1 and FTP.
2 The router routes requests to the other vender GNE.
3 The other vendor GNE performs mediation for TL1 and FTP, so the DCCs to ONS 15454 and
other vendor NEs are OSI-only.
4 CTC/CTM communicates with ONS 15454 NEs over an IP-over-CLNS tunnel between the
ONS 15454 and the GNE.
5 ONS 15454 NEs exchange TL1 over the full OSI stack. FTAM is used for file transfer.
131931
IP DCN
IP
IP
CTC/CTM
IP OSS
IP
Other
vendor GNE
ONS NE 1
ONS NE 2
Other
vendor NE
Other
vendor NE
IP and
OSI/PPP/DCC
OSI/LAP-D/DCC
OSI/LAP-D/DCC
OSI/LAPD/DCC
1
3
5
4
2

Table of Contents

Other manuals for Cisco ONS 15454

Related product manuals