Slide Rail Specifications
Slide Type: L-shelf
Install Type: Toolless
Slide Length: 645 mm
Working Load: 150 kg
Supported Rack Range: 645~917 mm
Supported Chassis Width: 448 mm
Use Space: 2U*645 mm
UL Strength Test: Yes
Cisco Slide Rail Kit, which is shipped with the server or with a replacement chassis.
Tools Required for Rack Installation
Following tools are required:
#2 Phillips Screwdriver
Lift table. If a lift table is not available, make sure to use at least two people to lift or maneuver the server.
Installing the Server
Before you begin
Ensure the floor where the rack is placed can support the combined weight of the rack, server, and any
other equipment.
Have a team of at least two to three people to assist with lifting and positioning the server.
Clear the area around the rack to ensure there is enough space to work.
Inspect the rack and server for any damage before starting the installation.
Consult Installation Warnings and Guidelines, on page 31.
Procedure
Step 1 Locate the Left Front and Right Front rails.
Each rail should have 4 screws.