Figure 29: Rear Left Rail
Step 3 Install front right and left rails:
a) Align the guide pins of the right rail with the rack holes on the front right side.
b) Push the rail until it hooks into position.
c) Check whether the rail hook position is hooked.
Figure 30: Front Right Rail
d) Align the guide pins of the left rail with the rack holes on the front left side.
e) Push the rail until it hooks into position.
f) Check whether the rail hook position is hooked.
Cisco UCS C885A M8 Server Installation and Service Guide
36
Installing the Server
Installing the Server