Product Manual Doc. 9349B Crestron Zūm® Wired Solutions 97
Install the Load Controller
WARNINGS:
l
To avoid fire, shock, or death, turn off the power at the circuit breaker or fuse and test
that the power is off before wiring!
l
Do NOT connect standard Ethernet ports on network-based devices to the orange
Zūm Link ports on any Zūm Link or Zūm Net device. Also, do NOT connect the purple
Zūm Net ports on the Zūm Net device to the orange Zūm Link ports on any Zūm Link
device. These connections may damage network devices.
NOTES:
l
Install and use this product in accordance with appropriate electrical codes and
regulations.
l
A licensed electrician should install this product.
l
The product should project 4.40in. (112mm) from the junction box when installed.
l
For use where temperatures are between 32° to 104°F (0° to 40°C)
l
For Chicago plenum compliant installations:
o
Ensure that the junction boxes and other electrical components are rated for
Chicago plenum.
o
Separate the high-voltage lines from the low-voltage cables.
o
Install two junction boxes: one junction box for the high-voltage lines and one
junction box for the low-voltage cables and load controller. A 6 in. square, 3.5 in.
deep box with conduit knockouts is recommended for the low-voltage cables
and load controller.