EasyManua.ls Logo

Crestron Zum - Ceiling Mounting

Crestron Zum
281 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
122 Crestron Zūm® Wired Solutions Product Manual Doc. 9349B
l
ZUMLINK-US-QUATTRO-DLS-RLY
l
ZUMLINK-IR-QUATTRO-HD-DLS-RLY
l
ZUMLINK-US-HALLWAY-DLS-RLY
l
ZUMLINK-US-ONEWAY-DLS-RLY
5. Using two mounting screws (not included), attach the back plate to the electrical box or
mud ring.
6. Attach the presence detector to the backplate. Refer to Remove or Attach the Backplate
on page 119.
7. Wire the presence detector according to the Zūm Wired System Diagram on page 125
Ceiling Mounting
A mounting hole 2.69 in. (68 mm) to 3 in. (76 mm) in diameter must be cut before mounting the
presence detector to the ceiling.
1. Cut a mounting hole that is 2.69in. (68mm) to 3in. (76mm) in diameter.

Table of Contents

Other manuals for Crestron Zum

Related product manuals