Index
Doc. 031851-05 12/04 Index-3
Flow path, 2-12
Flow rate, 2-11, A-3
Setting, B-28
Troubleshooting, 4-6
Fluid schematic, 2-12
Front panel, 2-2
Fuses
Changing, 5-21
Requirements, A-1
G
Gas source
Installation, B-19, B-22
Pressure requirements, A-2, B-19
Ghosting, 4-7
Guard column, 2-11, B-22
H
High pressure alarm, 4-2
Hub (USB), B-7 – B-8
Humidity limits, A-2
I
Icons used in manual, 1-5
ICS-90
Component mounting panel, 2-7
Flow path for system, 2-12
Flow rate, A-3
Front panel, 2-2
Rear panel, 2-4
Top cover, 2-2
Weight, B-2
ICS-90 Control panel (Chromeleon), 2-15, 3-8
Important icon, 1-5
Injecting sample
Syringe injection, 3-10
Vacuum syringe technique, 3-11
Via the AS40, 3-12
Injection events, 3-10
Injection port, 2-2
Injection valve, 2-10
Automatic reset, 3-10
Leaking, 4-5
Rebuilding, 5-18
Specifications, A-4
Installation
AS40 autosampler, B-33
Columns, B-22
Connecting to the computer, B-6
Gas source, B-19, B-22
Operational status verification, B-32
Power connection, B-8
Priming the pump, B-26, B-32
Setting up Chromeleon, B-10
Setting up the eluent and regenerant, B-20
Starting the ICS-90, B-9
Suppressor, B-24
Ion chromatography
Overview, 1-1
Ion exchange, 1-1
Isocratic delivery system, 1-1
L
Leaks
Fittings, 4-4
Injection valve, 4-5
Liquid, 4-4
Pressure transducer, 4-4
Pump head waste valve, 4-4
Suppressor, 4-5
LEDs
Link, 2-5
Status, 2-2
License (Chromeleon), B-10
Lifting the ICS-90, B-2
Line frequency, B-8
Linearity requirements, A-4
Link LED, 2-5, A-3
Liquid leaks, 4-4
Load/inject valve alarm, 4-2 – 4-3