8-230
ENGINE ELECTRICAL
-
Charging
Svstem
GENERATOR
<DOHC>
REMOVAL AND INSTALLATION
Pre-removal
and
Post-installation
Bank Warm Up Three-Way Catalytic
(Refer to GROUP 11
-
Exhaust
Pbe.
I
blain Muffler and Catalytic
Con&t&)
f
h
LF-7
,/PI/
-
‘I
IU--IL
Iyrn
.Ibs.
6
45
Nm
iTT=-
33ft.lbs.
13
Nm
ft.lbs.
Removal steps
1. Air hose E <Turbo>
2. Air pipe C
<Turbo>
u
3. Clamp nuts of suction hose
<Vehicles with air conditioning>
4. Drive belt
(Refer to GROUP 9
-
Service Adjustment
Procedures.)
5. Generator connector
6. Heated oxygen sensor connector
7. Generator and generator bracket assembly
8. Generator bracket
9. Generator
ii
-
18
ftlbs.
16FO346
SERVICE POINT OF REMOVAL
3. REMOVAL OF CLAMP NUT
On vehicles with air conditioning, remove the clamp nut,
raise the suction hose and suspend it from the engine hood
using a cord.